※ Fully automatic PID control with high precision and saving 30% power,
※ The two boxes are divided into two parts: high temperature zone and low temperature zone. The test products are placed in the basket. When the impact is raised, the test product is moved into the high temperature zone or the low temperature zone for weighing. The test product is dynamic and has a door opening safety system.
※ It adopts touch-type graphic control operation interface, which is easy to operate.
※ Impact mode Apply the air path switching method to introduce the temperature into the test area and do the thermal shock test.
※ When high temperature impact or low temperature impact, the maximum time can reach 999H, and the maximum cycle time can reach 9999 times.
※ The system can be used for automatic cycle or manual selective shock and can be set to start with two cold and hot starts.
※ Cooling and adopting binary refrigeration system, the cooling effect is fast.
※ Basket conversion time: Within 10 seconds (other requirements are agreed)
※ Execution meets the standards and test methods: GJB150.5 temperature impact test; GJB360.7 temperature impact test; GB/2423.22
model | WBE-LR2-49L | WBE-LR2-80L | WBE-LR2-150L | WBE-LR2-250L | WBE-LR2-335L | |||||||||||||||
Internal size WxDxH (cm) | 35×35×40 | 50×40×40 | 60×50×50 | 70×60×60 | 80×70×60 | |||||||||||||||
External dimensions WxDxH (cm) (top removable 150mm) | 128x167x190 | 138X177X200 | 148x187X210 | 158x197X220 | 170x210x220 | |||||||||||||||
Basket temperature range °C | 150℃~ABC | 150℃~ABC | 150℃~ABC | 150℃~ABC | 150℃~ABC | |||||||||||||||
A -40 | B -55 | C-65 | A -40 | B -55 | C-65 | A -40 | B -55 | C-65 | A -45 | B -55 | C-65 | A -40 | B -55 | C-65 | ||||||
Installed power KW (not power consumption) | 18 | 20 | 22 | 20 | 22 | 24 | 30 | 35 | 38 | 42 | 45 | 48 | 50 | 55 | 60 | |||||
Air-cooled/water-cooled | Air-cooled | Air-cooled | water-cooled | Air-cooled | Water-cooled (considering that the water tower freezes when it is installed outdoors, the equipment cannot be operated when it is frozen; in this case, the chiller can be selected) | |||||||||||||||
Water tower tonnage | Air cooling does not need | 8 | 8 | 8 | 8 | 15 | 15 | 15 | 15 | 15 | 15 | 15 | 15 | |||||||
Preheating temperature °C | +60℃~ +200℃ | |||||||||||||||||||
Pre-cooling temperature °C | A:-10℃~ -55℃ B:-10℃~ -70℃ C:-10℃~ -75℃ | |||||||||||||||||||
High temperature impact range | +60℃~ +160℃ | |||||||||||||||||||
Low temperature impact range | A:-10℃~ -40℃ B:-10℃~ -55℃ C:-10℃~ -65℃ | |||||||||||||||||||
Heating time (heat storage area) min | RT~200°C is about ≤35min | |||||||||||||||||||
Cooling time (cold storage area) min | A:+20~ -55℃About need60min B:+20~ -70℃About need≤70min C:+20~ -75℃About need85min | |||||||||||||||||||
Basket conversion time | 10S | |||||||||||||||||||
Ambient temperature | Air-cooled ambient temperature requirement -5~ +28°C; water-cooled ambient temperature requirement +5~ +35°C | |||||||||||||||||||
Weight (approximately) | 700Kg | 900Kg | 1200Kg | 1400Kg | 1900Kg | |||||||||||||||
Temperature recovery time | Within 5 minutes | |||||||||||||||||||
High temperature exposure for 30 minutes | ||||||||||||||||||||
Low temperature exposure for 30 minutes | ||||||||||||||||||||
Temperature control accuracy | ±0.5℃ | |||||||||||||||||||
Evenness | ±2.0℃ | |||||||||||||||||||
Internal and external materials | Steel plate electrostatic spraying surface treatment or SUS 304 stainless steel | |||||||||||||||||||
Internal material | SUS 304 stainless steel | |||||||||||||||||||
Insulation material | High density polyurethane foam + glass wool | |||||||||||||||||||
Control System | 7-inch touch screen, Chinese and English display, 120 sets of programs, 1200 segments, all cycles 99 times, partial cycles 99 times, temperature 0.1% of FS±1 digit Humidity: 0.1%of FS±1digit, temperature pt-100, humidity: pt- 100or 5V DCV; Communication USB or RS485 (other communication negotiation) | |||||||||||||||||||
The refrigerant | R404/R23 (environmental refrigerant) | |||||||||||||||||||
cooling system | Semi-closed two-stage compressor (water-cooled) / fully enclosed double-stage compressor (air-cooled) | |||||||||||||||||||
Safety device | 1. Compressor overpressure, overheating, overcurrent protection; 2 refrigerant high voltage protection switch; 3. fault alarm system; 4. thermal storage high temperature cold storage low temperature protection; 5. electronic alarm; 6. Water shortage alarm protection (water cooling); 7. No fuse switch; 8. Power phase sequence protection; 9. Test chamber temperature protection | |||||||||||||||||||
Standard accessories | Insulated glass viewing window, two sample holders, measuring hole diameter 50mm*1, power cord, manual | |||||||||||||||||||
power supply | AC380V 50HZ three-phase four-wire + ground wire | |||||||||||||||||||
Controller | Korea TECH Sanyuan / Tai Tong TATO | |||||||||||||||||||
compressor | France Bitzer BITZER compressor / France Taikang TECUMSEH compressor / Germany GEA blog compressor |